Tuesday, February 21, 2012

Rollback Steps When Upgrade From 9.3.1 To EPM 11.1.1.x Not Successful



Rollback Steps When Upgrade From 9.3.1 To EPM 11.1.1.x Not Successful [ID 1109365.1]

 Modified 20-JUL-2011     Type TROUBLESHOOTING     Status PUBLISHED 

Applies to:

Hyperion BI+ - Version: 9.3.1.0.00 to 11.1.1.3.00 - Release: 9.3 to 11.1
Microsoft Windows (32-bit)

Purpose

The purpose of this article is to provide information about steps involved in the rollback for Hyperion BI+, if upgrade from System 9.3.1 to Enterprise Performance Management (EPM) 11.1.1.x is not successful.

Scope

This document is intended for administrators and IT professionals with the task of administering Hyperion Reporting and Analysis application.  Person using this document is expected to have good understanding of installing Hyperion BI+.

Last Review Date

July 20, 2011

Instructions for the Reader

A Troubleshooting Guide is provided to assist in debugging a specific issue. When possible, diagnostic tools are included in the document to assist in troubleshooting.

Troubleshooting Details

Rollback Steps When Upgrade From 9.3.1 To EPM 11.1.1.x Not Successful

You should have a good backup before upgrade.  Refer to backup_recovery.pdf  file for a complete detail.

Files should be backed up in  9.3.1:
  •  Reporting and Analysis relational database.  Stop all services when perform a full backup
  •  Hyperion installation directory and all subdirectories, for example, C:\Hyperion
  •  OS registry including entries made by the installer
  •  Third-party vendor's Application Server directory that is used to deploy Reporting and
  • Analysis, for example, C:\BEA or C:\WebSphere.
  •  vpd.properties file, which is typically located in C:\Windows or C: \Documents and Settings\
  •  CSS.xml file \hyperion\deployments\your_web_apps\sharedservices9\config


If upgrade to 11.1.1.x was not successful and need to revert back, the following tasks should be performed:

  1. Uninstall Hyperion Shared Services and Hyperion BI+
  2. Install Hyperion Shared Services
  3. Run the configuration for HSS
  4. Copy over the \hyperion\...\var\openldap-data from BACKUP
  5. Apply any service pack or fixes if needed at this time for Hyperion Shared Services
  6. Login to the User Management Console
  7. Configure the external authentication if needed or copy the CSS.xml from BACKUP
  8. Install services and UI services
  9. Run the configuration for BI+
  10. Copy over the Root folder \Hyperion\biplus\data\RMI\Root from BACKUP
  11. Apply any service pack or fixes if needed at this time for Hyperion BI+
  12. Redeploy Workspace
  13. Login to Workspace and verify all your reports or open them in IRWC or HTML
  14. Setup DAS connection if needed or edit the server.xml with all the connections



Show Attachments Attachments

 backup_recovery.pdf (406.03 KB)

No comments:

Post a Comment