Current Environment:
- Oracle EBS 12.2.9
- Oracle Database 19c
- IBM AIX 7.2
- Production environment supporting critical business operations
- Target state includes Oracle EBS 12.2.15 and future database modernization (23ai/26ai)
- Future OCI adoption is under consideration but not yet approved
I need a detailed executive-level PowerPoint presentation suitable for:
- CIO
- Enterprise Architects
- Infrastructure Architects
- Database Architects
- Application Owners
- Program Managers
The objective is to evaluate three strategic options:
Option 1:
- Upgrade Oracle EBS from 12.2.9 to 12.2.15
- Retain Oracle Database 19c
- Retain IBM AIX 7.2
Option 2:
- Upgrade Oracle EBS from 12.2.9 to 12.2.15
- Migrate Application and Database tiers from AIX to Linux
- Upgrade Oracle Database from 19c to 23ai/26ai
- Align architecture for OCI readiness
Option 3:
- Upgrade Oracle EBS from 12.2.9 to 12.2.15
- Migrate Database tier from AIX to Linux
- Upgrade Oracle Database from 19c to 23ai/26ai
- Retain EBS Application tier on AIX
Create a professional PowerPoint deck with the following structure:
1. Executive Summary
2. Current State Architecture
3. Business Drivers
4. Technology Drivers
5. Oracle Support and Certification Considerations
6. Assumptions and Constraints
7. Option 1 Detailed Analysis
- Architecture
- Scope
- Benefits
- Risks
- Business Impact
- Infrastructure Impact
- Downtime Considerations
- Testing Requirements
- Cost Considerations
- Supportability
- OCI Alignment
8. Option 2 Detailed Analysis
- Architecture
- Scope
- Benefits
- Risks
- Business Impact
- Infrastructure Impact
- Downtime Considerations
- Testing Requirements
- Cost Considerations
- Supportability
- OCI Alignment
9. Option 3 Detailed Analysis
- Architecture
- Scope
- Benefits
- Risks
- Business Impact
- Infrastructure Impact
- Downtime Considerations
- Testing Requirements
- Cost Considerations
- Supportability
- OCI Alignment
10. Comparative Analysis Matrix
11. Risk Assessment Matrix
12. TCO Comparison (3-Year and 5-Year)
13. Downtime and Cutover Comparison
14. Future OCI Migration Impact Analysis
15. Operational Support Model Impact
16. Recommended Architecture
17. Proposed Roadmap
18. High-Level Project Timeline
19. Key Decisions Required from Customer
20. Executive Recommendation
For each slide provide:
- Slide title
- Executive talking points
- Suggested diagrams
- Speaker notes
- Key messages for leadership audience
The presentation should be consulting-grade and similar to deliverables produced by Oracle Consulting, Accenture, Deloitte, or IBM for architecture review boards.
No comments:
Post a Comment